Our Clovis subdivision kitchen has a tiny island nobody can sit at. Can you rework it into something we'll use?
Usually, yes. We look at clearances, where the sink and range sit and whether plumbing or power has to move for a bigger island. Then you get a written scope for the layout you pick.
I bought an older house near Old Town Clovis and I'm nervous about what's hiding in the walls. How do you handle that?
We look for warning signs at the site visit, like old panels or patched pipes, and talk about likely issues up front. If something new turns up once a wall is open, we stop, show you and put the change in writing before continuing.
My husband and I keep bumping elbows at our Clovis bathroom sink. Can you fit a double vanity?
Often, by borrowing a little space from a linen closet or reworking the layout. We check the drain and supply lines to see what's practical, then plan the vanity, lighting and mirror together.
We need a fourth bedroom in our Clovis home and don't want to move. Is an addition the way to go?
It often is on Clovis lots with a usable backyard. We look at the roofline, the foundation and how a new room joins the hallway. Sometimes reworking an existing space works too, and we'll show you both.
Does the City of Clovis have to sign off on moving a wall in my kitchen?
Moving walls, plumbing or electrical may need a permit from the City of Clovis building department. The city sets those requirements. We'll go over what your remodel likely involves when we walk the kitchen.
Our Clovis family room is dark and closed off. Could bigger windows or a wider opening help?
Often, yes. Enlarging a window or widening a doorway means new framing and a header, and better lighting can help too. We look at the wall and what runs through it before we plan anything.
I'd like to pick my own tile for our Clovis shower remodel. Do you work that way?
Yes. You choose the finishes and we build around them. We'll tell you the sizes and quantities we need so everything's on hand when it's time to set tile.
We're home all day with little ones. Which remodel days get loud?
Demo and framing are the noisiest. Drywall finishing, trim and cabinet work are much quieter. We'll mark the loud days on the plan so you can schedule naps and errands around them.
The laundry room in our Clovis place is basically a hallway closet. Can a remodel give it some space?
Often, by borrowing from a hall, closet or the garage wall. We check plumbing, venting and electrical to see what's possible and write up the options.
We've got a property loss at our Clovis house and the adjuster wants a repair estimate. Who writes that?
We can. We prepare an itemized repair scope and estimate, coordinate with your adjuster and then rebuild. Call (559) 257-2397 to set up a visit.